SITE TESTING AND COMMISSIONING PROCEDURE FOR 110 kV XLPE CABLES.
The aim of this procedure is
to establish guidelines for site testing and commissioning of 110kV XLPE Insulated
Single-Core Underground Cables.
The following are the
list of tests proposed to be carried out at site on 110 kV cables.
The procedure will cover the details of the below tests including the connection diagram of each test.
1 Phase Identification Test
2 Insulation Resistance Test
3 DC Conductor Resistance Test
4 Metallic Sheath Continuity Test
5 Outer Sheath DC Voltage Withstand Test/ Anti-Corrosion Test
6 Capacitance Test
7 SVL Test
8 Link Box Contact Resistance Test
9 Earth Resistance test
10 Cross Bonding Verification Test.
11 Positive/Negative & Zero Sequence Impedance tests.
You can download full testing procedures in pdf format from the below link.